Jintan District Changdang Lake ecological dredging project
(Phase II, Phase III) Construction project
Ecological dredging, sludge disposal and heavy metal treatment in lake area; The project plans to clear about 10.6 square kilometers of silt, 2.582 million square meters of
earth and 26,000 tons of river and lake wastes. The second phase of dredging covers an area of 4.27 square kilometers with 1.251 million square meters of earth. Phase III silting
covers an area of 6.33 square kilometers with 1.331 million square meters of earth. The total investment of the project is about 283 million yuan.
湖區(qū)生態(tài)清淤、淤泥處置及重金屬處理工程等;本項目計劃清淤面積約 10.6 平方公里,清淤土方量約 258.2 萬方,清除河湖垃圾 2.6
萬噸。其中二期清淤面積 4.27 平方公里,清淤土方 125.1 萬方;三期清淤面積 6.33 平方公里,清淤土方 133.1 萬方。工程總投資約 2.83
億元。
1. 絞吸清淤 2. 泥漿泵送 5. 泥漿均化
7.1.1 壓淲脫水后土餅 7.1.2 壓濾后余水 7.2.1 固化土方處理 7.2.2 余水排放
3. 泥漿過濾 4.HEC 固化劑攪拌 6. 壓濾脫水
Process flow of sludge dewatering and
consolidation integrated treatment technology
淤泥脫水固結(jié)一體化處理
技術(shù)工藝流程